Reversibility Measures for Sustainable Decisions
Increasing stress on the environment and current norms of sustainable development have prompted the formalization of new approaches to decision making. This may be achieved through the...

Risk-Based Planning and Management of Maintenance Dredging
The U.S. Army Corps of Engineers (Corps) Institute for Water Resources (IWR) is developing and applying a risk-based approach to address maintenance dredging cost, reliability, and budgetary...

CHEMFLO Modeling of Aquifer Bioremediation in Vadose Zone
This paper deals with bioremediation in the vadose zone with an emphasis on using numerical models as a tool to ensure that the concentration of nutrients is maintained at a required level....

Overview of DoD Research in Groundwater Modeling
The U.S. Army Engineer Waterways Experiment Station leads a multi-agency research program for the Department of Defense (DoD) which continues the development of integrated, comprehensive...

Computational Tools for Subsurface Conceptualization
Development of subsurface conceptual models for use in groundwater flow and transport modeling requires that existing data in the form of boring logs, cone penetrometer (CPT) logs, geophysical...

The DOD Groundwater Modeling System: A Conceptual Model Approach
A suite of new simulation tools have been developed in the version 2.0 of the Department of Defense Groundwater Modeling System (GMS). These add considerable complexity to the GMS which...

River Meander Zones and Floodplain Reconnection
A natural disturbance regime concept is described for understanding ecosystem changes due to human activities. Re-establishment of river meander zones is proposed as an application of...

Automated Tools for Spatially Distributed Rainfall/Runoff Modeling
A watershed modeling system (WMS) has been developed to address the needs of surface water rainfall/runoff computer simulations. WMS, developed at the Engineering Computer Graphics Laboratory...

Water Resources Planning for the Fort Peck Indian Reservation, Montana
Water resources planning in Indian Country has produced varied results. On the Fort Peck Indian Reservation, the Assiniboine and Sioux Tribes are using an integrated approach to managing...

Moving from a Model to a Decision Support System: Salt River Project's Experience with a Reservoir Simulation System
The Salt River Project (SRP) is in the third year of a process to develop a computerized hydra-meteorological decision support system (Hydromet) that will eventually cover all aspects...

Cost Effectiveness and Incremental Cost Analyses for Environmental Planning
The objective of this paper is to present an approach for evaluating alternative plans for environmental restoration and mitigation. After discussing problems that currently preclude the...

Equity Measures for Selecting Sustainable Projects
Once implemented, a project may result in social, ecological, and economic impacts on both spatially and temporally distributed groups. Sustainable project selection requires that distributional...

Constructor Prequalification
Choosing the Best Constructor and Avoiding Constructor Failure
This comprehensive, practical manual illustrates how owners can evaluate and select constructors for various civil engineering projects using the process of constructor prequalification....

Decision Support
A number of factors have combined to make a computer-based decision support system (DSS) for power system operations attractive to Great Lakes Power Limited (GLP), a private utility that...

Risk-Based Decision Making in Water Resources VII
This volume, Risk-Based Decision Making in Water Resources VII, comprises edited papers from the proceedings of the Seventh Engineering Foundation...

The Great Texas Prison Caper
The Texas Department of Criminal Justice, under court order to relieve prison overcrowding, worked with a team of six construction management firms and a building fabrication/erection...

When the Levee Breaks
As repairs to the billions of dollars in damages left by the Mississippi and Missouri floods continue, many engineers believe it is time to step back and see if there are better ways of...

Integration of Water Resource Models and GIS for Water Resource Management
As increasing demands are placed on water resources because of population growth and the resulting development, finding increasingly effective tools for management of natural resources...

Design and Implementation of an Optimal Real-Time Hydropower Generation Scheduling System for the Lower Colorado River in Texas
The Lower Colorado River Authority (LCRA) of Texas supplies water and electric power to over 800,000 persons in Central Texas. A real-time decision support system is being developed and...

Intelligent Decision Support System for Stage Discharge Analysis
A Decision Support System (DSS) for fitting stage-discharge (S-D) relations is being developed by the University of Manitoba, Facility for Intelligent Decision Support, for Environment...

 

 

 

 

Return to search